Change of Use for a Medical Practice in Berlin: What to Clarify Before Signing the Lease

Reception area of the Orthospace practice in Berlin

Anyone planning to open a medical, dental or therapy practice in Berlin rarely finds premises that are already approved for that use. More often the space was previously an office, a shop or an apartment. That raises a question that affects both schedule and budget: does the new use require a permit? From our practice projects we know that this question is best answered before the lease is signed.

When a change of use needs approval

Every building or unit is approved for a specific use, such as residential, office or retail. Turning it into a practice is a change of use (Nutzungsänderung). Under the Berlin building code, this is only possible without a building application if the new use is not subject to any public-law requirements other than those that applied to the previous use.

For practices, that is rarely the case. Patients, often with limited mobility, treatment rooms with technical equipment and more visitor traffic usually change the requirements for fire safety and escape routes, accessibility, sanitary facilities, ventilation and sound insulation. In most cases a building application is therefore required, with plans signed by an authorised professional, for example a registered architect.

Interior fit-out of the Orthospace practice in Berlin-Lichterfelde

Special case: converting an apartment

If an apartment is to become a practice, Berlin requires a second permit. Under the Berlin law prohibiting the misuse of residential space (Zweckentfremdungsverbot), housing may not be used for commercial or professional purposes without approval. The housing office of the relevant district is responsible.

Whether and under what conditions such a permit is granted is decided by the district on a case-by-case basis. This should be clarified before time and money go into planning.

In addition, the landlord must agree. In condominium buildings, the declaration of division (Teilungserklärung) is also decisive: if the unit is designated as residential, the other owners may be able to prohibit its use as a practice.

Waiting room of the Orthospace practice

What the building authority reviews

The building application addresses whether a practice is permissible at this location and whether the rooms meet the requirements of the new use. Typical topics include:

  • Planning law: Is a practice permitted under the local development plan or in the context of the surrounding buildings? Purely residential areas have tighter limits than mixed-use or central areas.
  • Fire safety: Two independent escape routes, smoke compartments, requirements for doors and corridors. On an upper floor of an old building with a single staircase, this is often the most demanding point.
  • Accessibility: Practices are open to the public. Step-free access, an accessible WC and sufficient manoeuvring space therefore become relevant early on, even if deviations are possible in existing buildings.
  • Structural safety: The application includes a structural safety certificate from a structural engineer. It confirms that the structure can carry the new use, for example higher imposed loads, heavy treatment units or altered walls.
  • Parking: Berlin has no general requirement for car parking spaces, but bicycle parking may be required.
  • Building services: Ventilation of internal rooms, sanitary facilities for staff and patients and, for dental practices, X-ray and instrument reprocessing.
Floor plan of the Orthospace practice

Process and timeline

For practices in Berlin we usually work in four steps:

  1. Property check before signing: We inspect the space, review the existing permit, planning law, escape routes and service routes, and assess whether the practice can be approved there.
  2. Design and room programme: Treatment rooms, reception, waiting area, technical and ancillary rooms are planned so that workflows and requirements fit together.
  3. Building application: We prepare the application documents including fire safety and accessibility documentation, coordinate the structural certificate with the structural engineer and submit everything to the district. For an apartment, the application to the housing office runs in parallel.
  4. Detailed design and construction: Once the permit is granted, tendering, fit-out and furnishing follow.

In our experience, an application for a change of use in Berlin usually takes around three months, depending on the district and the completeness of the documents. It is therefore worth not planning the lease start and opening date too tightly and, where possible, making the lease conditional on the permit. The contractual details should be agreed with a lawyer.

Checklist before signing the lease

  • What use is the space currently approved for?
  • Is it residential space, so that the Zweckentfremdungsverbot applies?
  • Are there two escape routes, and what is the staircase like?
  • Is step-free access possible, and where could an accessible WC be built?
  • Where do water, drainage, ventilation and electrics run, and can they be routed to the treatment rooms?
  • Do the landlord and, if applicable, the owners' association agree to the use as a practice?

How we support you

As an architecture studio in Berlin, we accompany practices from the first assessment of the space through the change of use and building application to the finished interior design. Our Orthospace practice in Berlin-Lichterfelde shows what this can look like. If you are planning a practice in Berlin, you can reach us via our enquiry form. In an initial conversation we discuss how we can support your project.

This article provides a general overview and does not constitute legal advice. The current regulations and the assessment of the responsible district office are decisive.

This form cannot be displayed because the use of cookies has not been accepted. Use the button below to open your cookie settings.

1
2
3
4
5
6

What type of Project are you interested In?

2
3
4
5
6

Where is the object located?

3
4
5
6

Is there already a budget?

4
5
6

When should the project start?

5
6

Do you already have plans or inspiration for your project?

6

Your contact details

Thank you! Book an introductory call with our team now.

Oops! Something went wrong while submitting the form. Please try again or email us directly.